Mapletree Business City @ Binh Duong – Phase 1B

Mapletree-Business-City

Project: Mapletree Business City @ Binh Duong – Phase 1B
Location: Binh Duong New City (BD Industry-Service-Urban Complex) , Ben Cat Dist.,
Binh Duong Prov., Vietnam
Project details: Mapletree Business City @ Binh Duong, which covers 75 hectares inside 4,200-hectare Binh Duong New City – the new capital of Binh Duong Province, is a new model for modern business and high-tech activities in Vietnam. The master plan shows a good balance of several multiple-purpose buildings and high quality infrastructures supporting a knowledge economy with a databank center, software sector, R&D center, new technology applications, etc.
A wide range of business space solutions is available at MBC@BD, including Business park offices, Ready-built facilities and Custom-built facilities.
Land area: 750,000 sqm – Gross floor area: 35,000 sqm
Employer:   Mapletree Business City (Vietnam) Co., Ltd.online casino

( Singapore )
Consultant: CPG Consultants and Engineers Vietnam Co., Ltd.
Status : General Contractor
Scope of works: .
Infrastructural works :
  • Earth works
  • Road works (Asphalt concrete base road of 12mx600m)
  • Storm water drainage
  • Waste water drainage
  • Fresh water supply
  • Street lighting system
  • Greenery planting
  • Fire fighting system
  • AC Medium voltage system
Building a 5-storey office of 2,400 sqm floor each storey
  • Piling with RC piles
  • Foundation construction
  • Post-tensioned pre-stressed concrete floors ( Sub-contractor: Freyssinet )
  • M&E works : Chiller-equipped central air-conditioning system, Building  Management System (BMS)
  • Four-sided glass-aluminium curtain walls
  • Internal Infrastructural works
  • Finishing works
Building 7 factories of 1,800 sqm floor each
  • Piling with RC piles
  • Foundation construction
  • Steel structure works
  • M&E works
  • Internal Infrastructural works
  • Finishing works
Contract value: VND 250 Billion (# USD 12,500,000)
Starting date: April 2011
Completion date: April 2012

Construction Works:

  1. Piling works
  2.  Road and sidewalk works
  3.  Drainage system works
  4. Reinforcement works
  5. Formworks
  6. Ground floor making works
  7. Suspended floor making works
  8. Post-tensioned floor works
  9. Masonry works
  10. Finishing works
  11. Curtain wall works